SF Novelty Cotton Eye Pillow (on sale)

$15.00

Our high-quality aromatic handmade lavender eye pillows are individually sewn and filled with 100% organic flax seed and lavender flowers. The exterior is 100% cotton, San Francisco theme novelty fabric, featuring the Golden Gate Bridge among other sites. Each eye pillow contains a blend of organic lavender & flax seed. All eye pillows are microwave…

Category:

Description

Our high-quality aromatic handmade lavender eye pillows are individually sewn and filled with 100% organic flax seed and lavender flowers. The exterior is 100% cotton, San Francisco theme novelty fabric, featuring the Golden Gate Bridge among other sites. Each eye pillow contains a blend of organic lavender & flax seed. All eye pillows are microwave and freezer safe.

They are 3.5×7.5 (in) and are about 3⁄4 (in) thick.
All sweet dreams products are hand crafted therefore size is slightly approximate.

To Heat: place pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.

To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.

Do not wash

Additional information

Weight 0.42 lbs
Dimensions 4 × 7.5 × 0.75 in
Sweet Dreams

2023 ©