Tote Bags -2020

Grocery Tote Bags

$28.00

Description

Using repurposed burlap coffee bean bags, our grocery tote is the right size and shape for easy packing and hauling.
Handcrafted with 95% post consumer material.
Gives the planet a break!

Do not wash as burlap will shed.
If stained can spot wash the straps.
Do not leave in direct sunlight.

Additional information

Weight0.42 lbs
Dimensions4 × 7.5 × 0.75 in