Yoga Mat Bag

$35.00

Description

Our yoga mat bags are made from high quality broadcloth. They feature a zippered front pocket, an adjustable strap, a reinforced bottom and a drawstring with toggle.

Our Yoga Mat Bags are 30″ height and 11 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.

Wash in cold water with like colors and hang dry. Do not leave in direct sunlight.

Additional information

Weight0.5 lbs
Dimensions6.5 × 12 × 2 in

You may also like…