Neck Wrap

$45.00

Our neck pillows are filled with organic rice, flax seed and lavender, featuring a cotton pillow inside with baffle construction and a soft flannel cover that is washable. These are freezer and microwave safe. They are 30″ height and 11 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate. Removable…

Category:

Description

Our neck pillows are filled with organic rice, flax seed and lavender, featuring a cotton pillow inside with baffle construction and a soft flannel cover that is washable. These are freezer and microwave safe.

They are 30″ height and 11 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.

Removable flannel cover is washable: cold water and hang to dry. Do not wash inside pillow.

To Heat: place neck pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.

To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.

Additional information

Weight 1 lbs
Dimensions 30 × 11 × 0.5 in

You may also like…

Sweet Dreams

2023 ©