Organic Cotton Eye Pillow
$20.00
Description
[tabs tabid1=”Description” tabid2=”Use & Care” tabid3=””]
[tab id=1]
Our high-quality aromatic handmade lavender eye pillows are individually sewn and filled with 100% organic flax seed and lavender flowers. The exterior fabric is made with 100% organic cotton.
Each eye pillow contains a blend of organic lavender & flax seed. All eye pillows are microwave and freezer safe.
They are 3.5×7.5 (in) and are about ¾ (in) thick. All sweet dreams products are hand crafted therefore size is slightly approximate.
[/tab]
[tab id=2]
To Heat: place neck pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.
To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.
Do not wash
[/tab]
[/tabs]
Additional information
| Weight | 0.4 lbs |
|---|---|
| Dimensions | 4 × 7.5 × 0.75 in |













