Dream Pillow

$16.00

Category:

Description

[tabs tabid1=”Description” tabid2=”Use & Care” tabid3=””]

[tab id=1]

Our dream pillows are made from 100% cotton and satin. We offer two options of herbal blends: lavender, chamomile, and mugwort or lavender, chamomile, and hops.

They are 4.5 × 4.5 (in) and are about 1¾ (in) thick.
All sweet dreams products are hand crafted therefore size is slightly approximate.

[/tab]
[tab id=2]

To Heat: place neck pillow in microwave and heat at 15 sec intervals on medium setting until it reaches desired temperature.
To Cool: place pillow in a ziplock plastic bag in the freezer until it reaches desired temperature.

Do not wash

[/tab]
[/tabs]

Additional information

Weight 0.5 lbs
Dimensions 4.5 × 4.5 × 1.75 in

You may also like…