Laundry Bag
$28.00
Description
[tabs tabid1=”Description” tabid2=”Use & Care” tabid3=””]
[tab id=1]
Laundry Bag are 27 1/2″ height and 15 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.
[/tab]
[tab id=2]
Do not wash as burlap will shed. If stained can spot wash the broadcloth and straps. Do not leave in direct sunlight.
[/tab]
[/tabs]
Additional information
| Weight | 0.5 lbs |
|---|---|
| Dimensions | 7 × 7 × 2 in |















