Beach Bag

$28.00

Category:

Description

[tabs tabid1=”Description” tabid2=”Use & Care” tabid3=””]

[tab id=1]

Beach Bag are 27 1/2″ height and 15 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.

[/tab]
[tab id=2]

Do not wash as burlap will shed. If stained can spot wash the broadcloth and straps. Do not leave in direct sunlight.

[/tab]

[/tabs]

Additional information

Weight 0.5 lbs
Dimensions 7 × 7 × 1.75 in

You may also like…