Yoga Mat Bag
$35.00
Description
[tabs tabid1=”Description” tabid2=”Use & Care” tabid3=””]
[tab id=1]
Our yoga mat bags are made from high quality broadcloth. They feature a zippered front pocket, an adjustable strap, a reinforced bottom and a drawstring with toggle.
Our Yoga Mat Bags are 30″ height and 11 1/2″ width. All sweet dreams products are hand crafted therefore size is slightly approximate.
[/tab]
[tab id=2]
Wash in cold water with like colors and hang dry. Do not leave in direct sunlight.
[/tab]
[/tabs]
Additional information
| Weight | 0.5 lbs |
|---|---|
| Dimensions | 6.5 × 12 × 2 in |
















