Zip Case (made to order)

$18.00

Our zip cases are made to order from high-quality broadcloth. They feature a zippered top and an inside lining. They are 8 × 4 (in) and come in a variety of colorful prints. All sweet dreams products are hand-crafted therefore size is slightly approximate. Wash in cold water with like colors and hang dry. Do…

Category:

Description

Our zip cases are made to order from high-quality broadcloth. They feature a zippered top and an inside lining.

They are 8 × 4 (in) and come in a variety of colorful prints. All sweet dreams products are hand-crafted therefore size is slightly approximate.

Wash in cold water with like colors and hang dry. Do not leave in direct sunlight.

Additional information

Weight 0.8 lbs
Dimensions 7 × 7 × 0.5 in

You may also like…

Sweet Dreams

2023 ©