CINCH BAG

$12.00

Cinch bags are a small backpack with drawstring closure. Brightly colored, durable broadcloth, perfect for being on the go. Wash in cold water, hang to dry.

Category:

Description

Cinch bags are a small backpack with drawstring closure.
Brightly colored, durable broadcloth, perfect for being on the go.

Wash in cold water, hang to dry.

Additional information

Weight 0.42 lbs
Dimensions 4 × 7.5 × 2 in
Sweet Dreams

2023 ©