Products


Dream Pillows
Our dream pillows are made from 100% cotton and satin. They are 5.5 x 5.5 (in). We offer two options of herbal blends: lavender, chamomile, and mugwort or lavender, chamomile, and hops.

Eye Pillows
Our eye pillows are made from a variety of satin and satin brocade fabric. They are 3.5×7.5 (in) and are about ¾ (in) thick. Each eye pillow contains a blend of organic lavender & flax seed. All eye pillows are finished by hand and are microwave and freezer safe. Purchase Eye Pillows here.

Zip Cases
Our zip cases are made from high quality broadcloth. They feature a zippered top and an inside lining. They are 8×4 (in) and come in a variety of colorful prints.

Yoga Mat Bags
Our yoga mat bags are made from high quality broadcloth. They feature a zippered front pocket, an adjustable strap, a reinforced bottom and a drawstring with toggle.

Neck Pillows
Our neck pillows are filled with organic rice, flax seed and lavender, featuring a cotton pillow inside with baffle construction and a soft flannel cover that is washable. These are freezer and microwave safe.